| Fabrication / Construction
Fabrication All systems are prefabricated at IPI's fabrication facilities prior to shipment to jobsites. Piping in stock is pulled and prepared according to specification: welded, cut-grooved, roll-grooved, mechanical or threaded systems in standard or thin wall schedules as required using. If required, prefabricated systems are sandblasted and painted in our finishing facility. Construction Safety is our number one priority. Constant attention to sound safety practices has resulted in years of superior safety records. Field work is conducted using the most efficient labor saving techniques and construction equipment for rapid, trouble-free installations. Construction capabilities cover underground, fire pumps, tanks and inside systems complete with testing and approval. Schedules are arranged to meet construction deadlines with capabilities to do shutdowns, tie-ins and emergency work to meet customer requirements. Field crews are available throughout the Southeastern U.S. making IPI local to most areas. |
|
(Engineering services provided by IPE-Industrial Process Engineers, P.C.) 800 Culp Road | P O Box 518 | Pineville, NC 28134 | TEL: 704-588-1100 | FAX: 704-588-5614 |